老师好大好硬好深好爽想要,精品少妇人妻av一区二区,操小穴视频羞羞在线观看,又紧又大又爽精品一区二区

RETURN

Return to list page
28

2022-11

Design Review Meeting for ADANI 0.5 MTPA Greenfield Copper Refinery Complex Project Is Successfully Held

In mid October, the Delegation of Kutch Copper Limited of Adani Enterprises Group, India (hereinafter referred to as “KCL”) visited China Nerin to carry out the design review meeting of the 0.5 MTPA Greenfield Copper Refinery Complex Project. Mr. Nilanjan Mukherji, General Manager of KCL smelter, Mr. Rakesh Patel, General Manager of KCL refinery, Mr. Wu Runhua, General Manager and Mr. Tang Zunqiu, Chief Technology Officer and other key team members of the project participated in the meeting, where the schemes of processes and equipment are thoroughly discussed.

The project design review meeting held successfully

As one of the World Top 500 Enterprises, Adani Group is the biggest port developer and operator in India, running Mundra Port - the largest commercial port in India. It is also an energy giant - one of the global largest photovoltaic power generation operators. The undergoing 0.5 MTPA Greenfield Copper Refinery Complex Project in Kutch, Gujarat with the technology of Flash Smelting Furnace + Peirce Smith Converter, is scheduled to be commissioned in 2024, which will become one of the biggest copper complexes with a single line in the world and will surely attract the attention of the global copper industry after its completion.

During the visit, KCL Delegation had all-around communications with China Nerin’s project team on the project schedule, design quality, equipment supply and the future production management, etc., and paid visits to the big copper complex designed by China Nerin and the equipment fabrication base of China Nerin.

Since August 2021 when China Nerin was awarded the Engineering Service Order and the Proprietary Equipment Purchase Order of the project, both parties have worked in a very supportive and cooperative way with mutual understanding to overcome the difficulties during the epidemic and in progress schedule, construction conditions and cultural differences. Through frequent virtual communications and discussions on various process and technical points, the basic engineering design of the Smelter, Refinery, Sulfuric Acid Plant and Gas Cleaning Plant are completed on after another. The detailed engineering of the project and the basic engineering of the Precious Metals Plant are progressing as per the schedule, and the construction of most of the civil foundations are accomplished at the project site.

Civil and structural steel work of the Flash Smelting Area is in process

KCL Delegation highly appraised the engineering design deliverables provided by China Nerin and gave high recognition and confidence in respect of the professionalism and technological knowledge of China Nerin.

China Nerin’s engineer, providing supervision service at the project site

In the process of the project implementation, owing to the specialization and quality service, China Nerin has also achieved successively the Purchase Orders of supplies of critical process equipment for the main smelting and refining plants, including Cyclone Smelting Burner, Lost-in-Weight Devices, Dynawave Scrubbing Device and Mercury Removal Device for the Gas Cleaning Plant, Peirce Smelter Converters, Anode Furnaces, Casting Wheels, and Tank House Special Cranes and Bales, Anode Preparation Machines, Robotic Cathode Stripping Machines, Anode Scrap Washing Machines, etc. A number of equipment with China Nerin’s independent R&D proprietary rights will be exported to the Indian market for the first time, bringing exports of a big number of Chinese large equipment, which will be a new contribution to upgrading the international influences of China’s technology and equipment in the global nonferrous metals industry.

昌宁县| 郑州市| 广德县| 浏阳市| 上犹县| 甘南县| 赤城县| 东乡| 大足县| 三明市| 黎城县| 新竹县| 历史| 青田县| 大厂| 汶上县| 湟源县| 松阳县| 东兰县| 五华县| 咸宁市| 沙湾县| 库尔勒市| 东台市| 南阳市| 连平县| 喀什市| 渝北区| 武鸣县| 庄浪县| 吴忠市| 菏泽市| 玉田县| 泸溪县| 柳河县| 田林县| 高唐县| 且末县| 沁源县| 德化县| 会同县|