老师好大好硬好深好爽想要,精品少妇人妻av一区二区,操小穴视频羞羞在线观看,又紧又大又爽精品一区二区

RETURN

Return to list page
01

2018-08

China Nerin wins the Engineering Design Contract for Phase II of SICOMINES DRC Concentrator Project

June 8th, China Nerin won the bid of the engineering design contract for Phase II of SICOMINES DRC Concentrator Project.

 

 In 2012, the engineering design contract for Phase I of SICOMINES DRC Concentrator Project was awarded to China Nerin. In 2014, the construction drawings were completed. In February 2015, Phase I of the project was smoothly completed and put into production and successfully reached the design capacity, that is, 83 kt/a cathode copper and 1.8 kt/a cobalt metal (as cobalt hydroxide) from 4,550 kt/a ore. Shortly after that, Phase I of the project became a model project of cooperation between China and D. R. Congo in central Africa and was visited by DRC President Joseph Kabila and other Chinese and DCR national leaders. The project is highly influential among the copper-cobalt mine projects with hydrometallurgical process which China Nerin has undertaken in central Africa. It expands the brand influence of China Nerin in central Africa.

 

 Following the success of Phase I, China Nerin made persistent efforts and won the concentrator design contract for Phase II of the project.

 

With the expansion in Phase II, the capacity of the project will be 250 kt/a cathode copper and 4.5 kt/a cobalt metal (as crude cobalt hydroxide) from 9,100 kt/a ore, making it a super large copper-cobalt mine with hydrometallurgical process.

 

The signing of this contract has laid a solid foundation for China Nerin to further consolidate and expand its share in the African market.

 

                                     

英山县| 塔河县| 稻城县| 龙陵县| 罗甸县| 广西| 仁怀市| 峡江县| 呼伦贝尔市| 榕江县| 鲁山县| 和田市| 广昌县| 富顺县| 新化县| 沁源县| 常熟市| 望城县| 若羌县| 吴堡县| 沙田区| 白城市| 闻喜县| 务川| 宁陕县| 镇康县| 梁河县| 寿宁县| 石嘴山市| 两当县| 精河县| 营山县| 新安县| 泰来县| 策勒县| 文登市| 敦煌市| 驻马店市| 安岳县| 尚义县| 东辽县|